14.09.15 03:00

Status week 37



Work continues with sheet piling. At the same time, work is taking place further south with casting for the anchor beam (on the right in the picture).

Fyrø has become connected to Nuuk and the excavators are removing the soil in preparation for blasting the rock.

Jord 060915Kaj 060915