14.09.15 03:00

Status week 37

 

P1070761

Work continues with sheet piling. At the same time, work is taking place further south with casting for the anchor beam (on the right in the picture).


P1070762
Fyrø has become connected to Nuuk and the excavators are removing the soil in preparation for blasting the rock.

Jord 060915Kaj 060915